Search
>
>
>
The company signed a contract for the design of the Yadis International Conference and Exhibition Center project

© Copyright 2019 ZhongTong Steel Structure Co,Ltd. ICP:鲁ICP备16030594号 Powered by www.300.cn

The company signed a contract for the design of the Yadis International Conference and Exhibition Center project

[Abstract]:
On November 14th, the project department of the Overseas Asia Diss International Conference and Exhibition Center was notified that our company successfully won the bid for the steel structure design section.

On November 14th, the project  department of the Overseas Asia Diss International Conference and Exhibition Center was notified that our company successfully won the bid for the steel structure design section.

 

The total construction area of the project is about 30,000 m2.  It consists of two exhibition halls, one central hall and one bridge restaurant. The steel structure includes truss structure and frame structure.  The original design adopts European standard design.

 

Editor: Wu Delu Review: Li Dongqiang Editor: Zhou Bin

 

The company signed a contract for the design of the Yadis International Conference and Exhibition Center project

Zhongtong